The complete set of professional design-build forms, contracts and agreements in one complete download.
Member Price ... $575.00
Designed for use by an Owner who engages a criteria professional/owner's consultant to assist him in the selection of a design builder using the competitive selection process.
Member Price ... $75.00
DBIA Document No. 575, Standard Form of Agreement Between Design Consultant and Design Sub-Consultant (2012 Edition) ("Agreement") sets forth the terms and conditions under which the design for the Project and other design services during the construction phase of the Project will be performed.Member Price ... $75.00
DBIA Document No. 580 Standard Form of Teaming Agreement Between Design-Builder and Teaming Party (2012 Edition) ("Agreement") is entered into by parties who desire to pursue a Project together as a Team.Member Price ... $75.00
For preliminary services only, not for construction services, and shall be used when Owner decides not to contract for the complete design and construction at one time.
Should be used only when the parties intend that Owner pay Design-Builder a lump sum fixed price for the completion of all design and construction services.
Should be used when the parties intend that Owner pay Design-Builder the Cost of the Work plus a Fee, with or without a Guaranteed Maximum Price (“GMP”).
The General Conditions of Contract provide the terms and conditions under which the Work of the Project will be performed.
Sets forth the terms and conditions under which the design for the Project and other design services during the construction phase of the Project will be performed.
Should be used when the parties intend that Design-Builder pay General Contractor the Cost of the Work plus a Fee, with or without a Guaranteed Maximum Price (GMP).
Should be used when the parties intend that Design-Builder pay General Contractor on a lump sum basis.
Should be used when the parties intend that Design-Builder pay Design-Build Subcontractor the Cost of the Work plus a Fee, with or without a Guaranteed Maximum Price (GMP).
Should be used only when the parties intend that Design-Builder pay Design-Build Subcontractor a lump sum fixed price for the completion of the Work.
Should be used when the parties intend that Design-Builder pay a lump sum to a Subcontractor that is not providing design services for the completion of the Work.
This Exhibit is to be used when the Participants have agreed to utilize BIM to assist with the design and/or planning of the Project.
Member Price ... $65.00
It includes all five Insurance Exhibits: Design-Builder’s Insurance Requirements, Owner’s Insurance Requirement, Design Consultant’s Insurance Requirements, Design-Build Subcontractor’s Insurance Requirements, General Contractor’s and Subcontractor’s Insurance Requirements.
Member Price ... $199.00
This Exhibit is to be used when Design-Builder is required to purchase and maintain insurance, with limits of liability, containing endorsements and subject to terms and conditions.
This Exhibit is to be used when Owner is required to purchase and maintain insurance, with limits of liability, containing endorsements and subject to terms and conditions.
This Exhibit shall be used if Design Consultant is required to purchase and maintain insurance, with limits of liability, containing endorsements and subject to terms and conditions.
This Exhibit shall be used if Design-Build Subcontractor is required to purchase and maintain insurance, with limits of liability, containing endorsements and subject to terms and conditions.